The job log.
Every job we build gets documented here — before, tear-off, mid-build, complete. Neighborhood and city only, never a street address. This page is the proof, not the pitch.

Job No. 001
Pearland 77584
Torn off and rebuilt in one day. Certified by an independent windstorm inspector the same week.
Read the file →

Job No. 002
Houston 77066
A seventy-photo inspection, a sunrise tear-off, and the whole property put back — roof, gutters, fence.
Read the file →

Job No. 003
Houston 77066
Tear-off and new shingles on the same Friday. The flashing was set at night, by flashlight, until it was done right.
Read the file →

Job No. 004
Houston 77066
One roof, one December day, a drone overhead the whole way — including the rotted decking the tear-off exposed.
Read the file →

Job No. 005
Houston 77066
The solar company went out of business. The panels came off, the roof was rebuilt, and the panels went back on — all in the same week.
Read the file →

Job No. 006
Houston 77083
Torn off and rebuilt in one December day — started in fog, finished in evening light.
Read the file →

Job No. 007
Houston 77066
A roof system built layer by layer — documented from tear-off to drip edge, with a return visit to check the details.
Read the file →

Job No. 008
Houston 77066
Documented before the job, torn off at sunrise, and photographed finished the next day.
Read the file →

Job No. 009
Houston 77066
A solar array stood between this roof and its rebuild. The panels came down one day, the new roof went on the next — all of it on camera.
Read the file →

Job No. 010
Houston 77066
Inspected in October. Rebuilt under a gray January sky. Flown two days later in full winter sun.
Read the file →

Job No. 011
Alice, Texas
Two hundred miles from our usual routes: a homestead where the roof came off two layers deep, and the fence line came back post by post. We travel for the right job.
Read the file →

Job No. 012
Houston 77066
Chalk-mapped in November, rebuilt in one December day — finished in golden light, then the lawn swept for nails with a magnet at dusk.
Read the file →

Job No. 013
Houston 77066
The record starts at dawn on build day — trucks in the drive, tarps down — and ends a day later with a drone over new shingles.
Read the file →
Every roof we build gets documented here.
First entries land [month].