Job No. 002

Houston 77066

A seventy-photo inspection, a sunrise tear-off, and the whole property put back — roof, gutters, fence.

October 29. The finished roof, from above the street.
October 29. The finished roof, from above the street.
inspected
October 21, 2025 — seventy photos
torn off
October 28, 2025
finished + photographed
October 29, 2025
gutters
logged complete November 1, 2025
fence
Japanese cedar with rot board, November 10, 2025
warranty
issued December 2025

What we found

The storm didn't stop at the shingles. The inspection covered the whole property in one morning — roof, gutters, downspouts, garage door, fence — and photographed all of it before anything was scoped.

October 21. The house before the build — an inspector already up on the ridge.
October 21. The house before the build — an inspector already up on the ridge.
October 21. Chalk circles over impact points on the shingle field — inspection documentation.
October 21. Chalk circles over impact points on the shingle field — inspection documentation.
October 21. A downspout at the front wall, dented.
October 21. A downspout at the front wall, dented.
October 21. The fence line, weathered and impact-marked — noted for the scope.
October 21. The fence line, weathered and impact-marked — noted for the scope.

Build day

The trailer and equipment were staged before the sun was fully up. Tarps went over the flowerbeds and shrubs before the first shingle came off.

October 28. Tear-off at first light, from the drone.
October 28, first light. The dump trailer and equipment staged in the driveway.
October 28, first light. The dump trailer and equipment staged in the driveway.
October 28. Tarps over the front beds and shrubs before tear-off.
October 28. Tarps over the front beds and shrubs before tear-off.

Down to the deck

The drone kept the record: old shingles off, decking exposed and checked, new synthetic underlayment going down behind the tear-off the same day.

October 28. From above — the old roof coming off to bare decking.
October 28. From above — the old roof coming off to bare decking.
October 28. New synthetic underlayment working up both planes toward the open ridge.
October 28. New synthetic underlayment working up both planes toward the open ridge.

The finish

The drone went back up the next day for the finals.

October 29. Straight down — every plane and ridge line new.
October 29. Straight down — every plane and ridge line new.

Then the fence

Forty feet of fence had taken the same storm. Posts came out and were reset, a cracked one was replaced, and new Japanese cedar pickets went up over a rot board.

November 10. A new post set against the old line, concrete mix at its base.
November 10. A new post set against the old line, concrete mix at its base.
November 10. The new cedar run going in beside the old grey fence.
November 10. The new cedar run going in beside the old grey fence.

Don't take our word for it.