Job No. 010

Houston 77066

Inspected in October. Rebuilt under a gray January sky. Flown two days later in full winter sun.

January 15. Straight down over the finished roof.
January 15. Straight down over the finished roof.
inspected
October 21, 2025
build day
January 13, 2026
drone finals
January 15, 2026
underlayment
CraftGrade W20 synthetic, full deck
protection
beds and walkways tarped before tear-off
documentation
ground and air, October through January
status
complete

The October inspection

Before anything else happened, the roof was walked and photographed — the whole field, not a convenient corner of it. The worn shingles made their own case.

October 21. The house from the drive — single-story brick, the old roof over the porch gables.
October 21. The house from the drive — single-story brick, the old roof over the porch gables.
October 21. On the roof: the worn field around the chimney, turbine vents and cap in frame.
October 21. On the roof: the worn field around the chimney, turbine vents and cap in frame.
October 21. Down the hip line — a shingle surface at the end of its life.
October 21. Down the hip line — a shingle surface at the end of its life.

Build morning, under cloud

January came in gray. Before the first square of old roof moved, everything below it was covered or carried clear.

January 13. The flowerbeds under tarps, tear-off already opening the roof above.
January 13. The flowerbeds under tarps, tear-off already opening the roof above.
January 13. The trailer backed to the porch, potted plants moved clear, crew on the ridge.
January 13. The trailer backed to the porch, potted plants moved clear, crew on the ridge.

Down to the wood

The drone kept station overhead while the old roof came off. One frame holds the whole method: old shingle, bare deck, and new underlayment meeting on the same slope.

January 13. Straight down mid-tear-off — old shingle, bare deck, and underlayment in one frame.
January 13. Straight down mid-tear-off — old shingle, bare deck, and underlayment in one frame.
January 13. The deck opened up, tarps ringing the house below.
January 13. The deck opened up, tarps ringing the house below.

The system, layer by layer

Synthetic underlayment sealed the deck, then the new field went up slope by slope. The spec sat on the driveway where the camera could read it.

Mid-build. The drone straight over the sealed deck as the shingle line climbs the slopes.
January 13. The spec staged on the driveway — shingle bundles, cap nails, felt rolls, new pipe flashings.
January 13. The spec staged on the driveway — shingle bundles, cap nails, felt rolls, new pipe flashings.
January 13. The new field advancing over CraftGrade W20 synthetic underlayment.
January 13. The new field advancing over CraftGrade W20 synthetic underlayment.

Two days later, from the air

The clouds that sat over the build were gone by the time the drone came back for finals.

January 15. The new field from the roof, winter sun across the shingles.
January 15. The new field from the roof, winter sun across the shingles.
January 15. The finished roof over the house, from out front.
January 15. The finished roof over the house, from out front.